UpRenovation
Fixed-Price Bathroom Renovation

Bathroom Renovation in Vancouver

A bathroom is a small room that hides a lot of expensive decisions - and most of what decides whether yours lasts is behind the tile, not on it. We renovate bathrooms across Vancouver on complete fixed-price quotes, with the waterproofing and plumbing priced as carefully as the finishes you'll actually see.

The Work

What a bathroom renovation involves

Square foot for square foot, a bathroom is the most demanding space in your home: waterproofing, plumbing, ventilation, and tile all packed into a small footprint, most of it invisible once the job is done. The membrane behind your tile is what keeps water out of your walls and the ceiling below - done wrong, it fails silently and expensively. That's why we treat the invisible work as the real job and the finishes as the reward.

Our process is built to remove the guesswork. The owners walk your space, check what's likely behind the existing walls, and write a fixed-price proposal that names the waterproofing system, the fixtures, and exactly what's included. We pull the plumbing and electrical permits, coordinate strata approval and water shut-offs if you're in a multi-unit building, and respect curing times for membranes and grout instead of rushing them - because rushed waterproofing is how failures happen.

We build everything from powder rooms to primary ensuites, and a lot of our work in Vancouver is in older homes where pulling a tub reveals rot, mould, or dated plumbing. We plan for that possibility honestly in the quote rather than pretending it won't happen - which is the difference between a footnote and a change order.

What's included

Demolition & prep

Careful tear-out with an honest assessment of what the old walls were hiding before anything new goes in.

Waterproofing & tiling

A proper membrane system behind the tile, with curing times built into the schedule - the part of the job that decides how long it lasts.

Plumbing & fixtures

Tubs, walk-in showers, toilets, and faucets - kept in place where it saves money, relocated properly where the layout is worth it.

Vanities & storage

Stock or custom vanities, medicine cabinets, and built-in niches sized to how you actually use the room.

Electrical & ventilation

GFCI outlets, lighting, and a properly sized exhaust fan - the quiet insurance policy against moisture problems.

Glass & finishing

Frameless or framed shower glass, mirrors, paint, and hardware to close the project out cleanly.

Comfort upgrades

Heated floors, heated towel bars, and smart ventilation where the budget and the room call for them.

Good to Know

What waterproof should actually mean behind your tile

Tile and grout are not waterproofing - they are the wear surface over it. The membrane underneath is the real barrier, and there is a recognized standard for it: ANSI A118.10, which requires the membrane to run continuous from the drain to the full height of the tiled assembly, sealed through every change of plane - corners, curbs, the niche that holds your shampoo. Since 2024 the standard also distinguishes sheet from liquid-applied systems and adds a low-permeance class for steam showers. You do not need to memorize any of that; you need the system named in writing before work starts.

Liquid-applied membranes also come with manufacturer-specified thicknesses and cure times between coats and before tile - hours to days that cannot be compressed. When a bathroom schedule includes days where seemingly nothing happens, that is often the waterproofing being allowed to become waterproof. A schedule with no such days is the one to question.

The other half of moisture control is air. BC's ventilation requirements send bathroom exhaust outside the building envelope - not into an attic or soffit, where years of damp air quietly turns into a mould problem. A properly sized, properly ducted fan is the cheapest insurance in the whole room.

Good to Know

The permit logic, and who is allowed to pull which one

Bathroom permits in Vancouver follow one question: is pipe moving? A like-for-like swap - new toilet in the same spot, new faucet on the same lines - generally needs no plumbing permit. Move a drain, add a fixture, or convert a tub to a walk-in shower with a relocated drain, and a municipal plumbing permit follows. Electrical has its own trigger: any new circuit, from a heated floor to a dedicated fan, needs an electrical permit - issued by the municipality itself in some Lower Mainland cities and by Technical Safety BC in others, as of mid-2026.

Who can hold the permit is as regulated as whether one is needed. An owner living in their own detached house can often self-permit; in a strata unit, a duplex, or any rental, the rules route the work through licensed contractors, with no homeowner shortcut. Either way the inspections are identical - the difference is whose name answers for the work.

Good to Know

Rough-in day, and what an older bathroom might be hiding

Plumbing and electrical are each inspected twice: at rough-in, with pipes, vents, and wiring run but nothing closed, and at final. Rough-in is the only chance anyone gets to see the work - after drywall, an inspector is taking someone's word for it, which is why work covered before acceptance can be ordered opened again at the owner's expense. Good schedules treat inspection days as fixed points, not interruptions.

If your home predates 1990, the tear-out has its own rulebook. WorkSafeBC requires a hazardous-materials survey by a qualified person before renovation or demolition, because that era's drywall compound, sheet vinyl, and tile adhesives commonly contain asbestos. And since 2024, removing it is licensed work: abatement companies must hold a WorkSafeBC licence and their workers must be certified, with a public registry to check both. Testing before demolition is not an upsell - it is the law, and it protects your household as much as the crew.

Expect the room to be out of service for the full run: demolition, rough-ins, inspection, membrane and cure, tile, fixtures, glass, then a walkthrough where you and your contractor list anything to correct before the job is called done. The days become predictable when the sequence is respected - which is the point of having one.

Approvals

Permits & approvals in Vancouver

Swapping fixtures like-for-like usually doesn't require a permit, but moving or adding plumbing generally needs a plumbing permit, and new circuits - heated floors, added lighting, a new fan - are permitted through Technical Safety BC by a licensed electrical contractor. In a condo or townhouse in Vancouver, bathroom work almost always needs strata approval too, plus coordination around building water shut-offs. We handle the applications, the scheduling, and the inspections as part of the fixed price.

Vancouver runs its own permitting system through the City of Vancouver's Development and Building Services, and it is the only municipality in BC that builds to its own bylaw — the Vancouver Building By-law — rather than the provincial code directly. Simple like-for-like renovations may qualify for the city's faster review stream, while anything structural, heritage-related, or involving a new suite goes through standard review, which is where the longer waits live. Character and heritage considerations on the west side can add another review layer before a permit is issued. We handle the application, coordinate the drawings, book the inspections, and start the paperwork early so review time runs alongside planning instead of after it.

  • Homes built before about 1950 often still have knob-and-tube wiring or galvanized plumbing that has to be dealt with once walls are open
  • Pre-1990 materials routinely require a hazmat survey for asbestos before demolition — a standard early step when it's planned for, a costly surprise when it isn't
  • Character home retention rules on the west side can shape what you're allowed to change on the exterior
  • Vancouver Specials and other homes with ground-level space are strong candidates for legal secondary suites
  • Condo and townhome projects need strata approval on top of city permits, and the two run on separate clocks
Local Detail — Vancouver

How Vancouver's building permit process actually works

Renovation permits in Vancouver run through the city's Development, Buildings, and Licensing department, and nearly everything now happens online: applications go in through the city's permits portal, and once a permit is issued, inspections are requested and tracked through the same account. There is also a lighter path many homeowners never hear about. The city's field review process lets qualifying small renovation projects be reviewed on site by an inspector instead of waiting in the full plan-review queue. Eligibility depends on scope, and anything structural, heritage-related, or involving a new suite still goes through full review with professionally sealed drawings.

The queue itself is better than its reputation. After years of backlog headlines, the city began publishing its processing times and reported median reviews for home renovations roughly cut in half between 2023 and 2024. As of mid-2026, simple like-for-like projects often clear review in weeks while suites, additions, and structural work still take months, so check the city's current published times and let design overlap with review.

If you have renovated in a neighbouring city, expect Vancouver to feel more formal. It is the only municipality in BC that reviews against its own building code, the Vancouver Building By-law, which was updated again in 2025, and details in drawings prepared for a project in Burnaby or on the North Shore sometimes need adjusting before they are submitted here.

01

One Fixed Price

What we quote is what you pay. Our proposals are complete and itemized, so the number you sign is the number you settle on.

02

Communication First

Same-day answers, weekly updates, and one point of contact from the first call to the final walkthrough. You always know where your project stands.

03

Owner-Operated

The people you meet are the people who plan, manage, and stand behind the work. Full-scope general contracting — not a handyman service.

Process

How your bathroom renovation runs, start to finish

  1. 01

    Initial Consultation

    We meet to discuss your project, review your plans, and give you an honest assessment of scope, timeline, and budget.

  2. 02

    Detailed Estimate

    A complimentary site visit followed by complete, transparent pricing. No guesswork, no surprises.

  3. 03

    Design Coordination

    Already have plans? We review them. Need design support? We connect you with the right people and manage the process.

  4. 04

    Pre-Construction

    We handle permits, finalize schedules, and coordinate trades before a single tool hits the site.

  5. 05

    Build & Execution

    Our team performs the work directly. Weekly updates, same-day communication, and daily quality control throughout.

  6. 06

    Handover

    Final walkthrough, warranty information, and post-completion support. Built to last, documented clearly.

Answers

Bathroom Renovation in Vancouver: FAQs

How much does a bathroom renovation cost in Vancouver?

A standard full bathroom renovation in Vancouver typically costs $18,000 – $40,000, covering a new tub or shower, tile, vanity, fixtures, and ventilation. Powder rooms run $8,000 – $18,000, primary ensuites $30,000 – $60,000, and spa-level ensuites $60,000 – $100,000 or more. Your real number depends on your space and what's behind the walls - which is why we quote fixed-price against your actual bathroom, not a formula.

How long does a bathroom renovation take?

Most full bathrooms run 2 to 4 weeks on site; powder rooms take 1 to 2. Waterproofing membranes and grout need curing time you can't rush, and custom vanities or special-order tile carry lead times - so we order early and sequence the trades so the schedule holds.

Do I need a permit for a bathroom renovation?

Generally only when the scope goes beyond like-for-like replacement: moving or adding plumbing needs a plumbing permit, and new electrical circuits need a Technical Safety BC permit through a licensed contractor. In multi-unit buildings, strata approval is required for most bathroom work regardless. We confirm the triggers for your scope before quoting.

Can we live at home while the bathroom is renovated?

Yes, in almost every case. If it's your only bathroom, tell us early - we sequence the work to shrink the window without a working toilet and shower to the absolute minimum, and we give you exact dates so you can plan around it.

Can't I just replace the tub and tile and skip the rest?

Sometimes - a focused refresh genuinely costs less than a full gut, and when it's the right call we'll say so. But if the waterproofing or plumbing behind the tile is failing, patching over it is a false saving that leaks back in a year or two. We tell you honestly which situation you're in before you spend anything.

Start Your Project

Ready to Start?

Get a fixed-price estimate for your bathroom renovation in Vancouver. We'll walk the space, price it completely, and stand behind the number.