UpRenovation
Fixed-Price Renovations

Kitchen Renovation

A kitchen is the most layout-sensitive room in a home, and it's the project homeowners in Metro Vancouver most often struggle to get a straight price on. We quote every kitchen as one complete, fixed-price number - cabinetry, counters, trades, and the behind-the-wall realities - and then we hold it.

The Work

What a kitchen renovation involves

A kitchen renovation covers cabinetry, countertops, appliances, flooring, lighting, and the plumbing and electrical work that ties it all together. The single biggest decision is layout: keep your sink, stove, and fridge roughly where they are and most of your budget goes to finishes you can see. Move them, or take down a wall to open the kitchen to the living space, and you're into structural and mechanical work - often worth doing, but only as a decision you make with the cost in front of you.

We run kitchens as a full general contractor, not a cabinet installer. You get a detailed fixed-price proposal that spells out exactly what's included and what isn't, a locked start date, and one point of contact from demolition to walkthrough. The owners are on site regularly - catching issues before they become problems is cheaper than fixing them after - and we handle the permits, the trade scheduling, and the strata paperwork if you're in a multi-unit building.

Most of our kitchen clients in Metro Vancouver fall into two groups: homeowners planning their first major renovation, and people who were burned by a previous contractor and want the next one priced honestly. Both get the same process - a real walkthrough, a complete number, and no pressure.

What's included

Cabinetry & millwork

Stock, semi-custom, or fully custom cabinets, ordered early because lead times drive the whole schedule.

Countertops & backsplash

Templating, fabrication, and installation of laminate, quartz, or natural stone with tile or slab backsplashes.

Plumbing & gas

Sink, dishwasher, and range connections - kept in place where it saves money, re-routed properly where the layout calls for it.

Electrical & lighting

New circuits, under-cabinet and task lighting, and updates to older wiring found behind the cabinets.

Flooring

New floors with subfloor prep and clean transitions to the rest of the home.

Layout & structural changes

Removing or opening walls with proper engineering, framing, and finishing when you want a more open plan.

Permits & inspections

Building, electrical, and plumbing permits identified, pulled, and inspected as part of the job - not left on your plate.

Good to Know

Who actually issues the permits for a Metro Vancouver kitchen

A kitchen that moves services can sit on three or four permit tracks at once, each with its own issuer. Building and plumbing permits come from your municipality's building department. Electrical is the one that surprises people: as of mid-2026, some Lower Mainland municipalities issue and inspect their own electrical permits under authority delegated by Technical Safety BC, while in the rest, Technical Safety BC handles it directly. Gas work - moving a range connection, extending a line - carries its own permit and is licensed-contractor territory in most renovation scenarios. The code is the same everywhere; what changes is who holds the paperwork.

Homeowner permits are narrower than most people assume. BC lets an owner pull their own electrical or gas permit only for a detached home they own and live in - not a strata unit, not a duplex, not a home with a rental suite or business - and the work still has to pass the same inspections. For most kitchens the practical route is licensed trades, because the name on the permit is the name responsible for the work.

Good to Know

Opening a wall is an engineering decision before a design one

If your new layout removes or opens a wall that might be carrying load, the permit application needs drawings stamped by a professional engineer - showing the existing condition, the beam that replaces the wall with its size and material, the bearing points and connections, and how the structure is supported while the swap happens. Your municipality reviews that design before issuing the permit, and the building inspector later checks the installed beam against those drawings before anything is closed in.

The sequence matters more than the paperwork: engineer first, then permit, then demolition. It adds time to the front of the project rather than the middle - which is exactly where you want it. A wall opened without that trail becomes a problem at resale, at insurance time, or at the inspection you eventually cannot avoid.

Good to Know

The range hood clause almost nobody reads

Every range hood has to duct to the outdoors through non-combustible, corrosion-resistant duct with a grease filter at the intake - never into an attic or a joist bay. The lesser-known rule arrives when you upgrade to a powerful pro-style hood: BC's residential ventilation requirements pair high-capacity exhaust with make-up air, meaning a supply fan that brings in roughly as much outdoor air as the hood throws out, wired to run whenever the hood runs, and tempered so you are not pouring winter air into your kitchen.

That one appliance choice can quietly add duct routing, an electrical circuit, and a small heater to the scope. None of this is a reason to give up the hood you want - it is a reason to choose appliances early, so the mechanical work is designed in from the start instead of discovered at rough-in.

Good to Know

Why the walls stay open until the inspector has been through

Permitted work in Metro Vancouver is inspected in stages: rough-in first, while framing, wiring, pipe, and venting are still visible, then final at the end. The rough-in visit is the only time anyone can verify what ends up behind your drywall, and the rules give that moment teeth - work concealed before a building official accepts it can be ordered uncovered at the owner's expense.

The application itself is lighter than people fear for interior work: scaled floor plans of the kitchen as it is and as it will be, a description of the work, and stamped structural drawings only where structure changes. In homes built before 1990, one step comes before any of it - a hazardous-materials survey by a qualified person ahead of demolition, a WorkSafeBC requirement, because drywall compound and flooring adhesives from that era commonly contain asbestos.

Approvals

Permits & approvals

A cosmetic kitchen update - new cabinets and counters in the same layout - usually doesn't need a building permit. Moving plumbing or gas, adding circuits, or removing a wall generally does, and electrical work in BC is permitted separately through Technical Safety BC by a licensed contractor. If your kitchen is in a condo or townhouse in Metro Vancouver, your strata's alteration approval sits on top of the municipal permit. We identify what your scope triggers, pull the permits, and schedule the inspections so nothing gets closed in before it's signed off.

01

One Fixed Price

What we quote is what you pay. Our proposals are complete and itemized, so the number you sign is the number you settle on.

02

Communication First

Same-day answers, weekly updates, and one point of contact from the first call to the final walkthrough. You always know where your project stands.

03

Owner-Operated

The people you meet are the people who plan, manage, and stand behind the work. Full-scope general contracting — not a handyman service.

Process

How your kitchen renovation runs, start to finish

  1. 01

    Initial Consultation

    We meet to discuss your project, review your plans, and give you an honest assessment of scope, timeline, and budget.

  2. 02

    Detailed Estimate

    A complimentary site visit followed by complete, transparent pricing. No guesswork, no surprises.

  3. 03

    Design Coordination

    Already have plans? We review them. Need design support? We connect you with the right people and manage the process.

  4. 04

    Pre-Construction

    We handle permits, finalize schedules, and coordinate trades before a single tool hits the site.

  5. 05

    Build & Execution

    Our team performs the work directly. Weekly updates, same-day communication, and daily quality control throughout.

  6. 06

    Handover

    Final walkthrough, warranty information, and post-completion support. Built to last, documented clearly.

Answers

Kitchen Renovation: FAQs

How much does a kitchen renovation cost in Metro Vancouver?

Most full kitchen renovations in Metro Vancouver cost $45,000 – $80,000, covering semi-custom cabinets, quartz counters, appliances, flooring, and lighting. A cosmetic refresh in the same layout runs $25,000 – $45,000, while high-end kitchens with custom cabinetry and layout changes run $80,000 – $150,000 and beyond. The number that matters for your kitchen is a detailed fixed-price quote against your actual space - which is exactly what we build before any work begins.

How long does a kitchen renovation take?

Most kitchens run 4 to 8 weeks on site once demolition starts. The part people forget is the clock before that: design, permits, and ordering - custom and semi-custom cabinetry commonly takes 8 to 16 weeks from final design to delivery. We order long-lead items the day your design is locked so the crew is never waiting on a truck.

Do I need a permit to renovate my kitchen in Metro Vancouver?

Not for a like-for-like cosmetic update, usually. You generally do need permits once you move plumbing or gas, add electrical circuits, or remove a wall - and in a condo or townhouse, strata approval is required on top. We confirm exactly what your scope triggers before we quote, so the permit path is priced in rather than discovered later.

Can we live at home during a kitchen renovation?

Yes - most of our clients do. We help you set up a temporary kitchen, contain dust between the work zone and the rest of the house, and give you an honest heads-up about the few days when water or appliance hookups are down. Knowing the schedule in advance is what makes it livable.

Why is your kitchen quote higher than another contractor's?

Because it's complete. A low quote is often low because it leaves things out - an unrealistic cabinet allowance, no budget for old wiring, 'extras' that aren't in there yet. The budget then creeps through change orders once the walls are open and you're committed. We price everything up front and hold the number: what we quote is what you pay.

Start Your Project

Ready to Start?

Get a fixed-price estimate for your kitchen renovation. We'll walk the space, price it completely, and stand behind the number.