Renovation Contractor in Burnaby
Fixed-price renovations across Burnaby — kitchens, bathrooms, basements, suites, and whole homes, managed directly by the owners.
Renovating in Burnaby
Burnaby renovates on two fronts at once: post-war family homes on generous lots in neighbourhoods like Burnaby Heights and South Slope, and thousands of condos in the tower clusters around Metrotown, Brentwood, and Lougheed. The same week can have us opening up a 1950s bungalow and coordinating elevator bookings in a 30-storey high-rise, and the two jobs share almost nothing except the city that permits them. What they do share is our approach: one written scope, one fixed number, and a schedule that accounts for Burnaby's approval steps before work begins.
Burnaby's single-family streets filled in largely between the 1940s and the 1970s — bungalows and two-storeys on lots that are wide by today's standards, most with full-height basements. Burnaby Heights and Capitol Hill carry the older end of that stock, while the streets toward Deer Lake and South Slope skew 1950s–60s. The condo stock is its own world: concrete high-rises have risen around Metrotown since the 1980s and around Brentwood and Lougheed more recently, alongside older wood-frame apartment buildings from the 60s and 70s. Suited homes are common, and many basements that aren't suites yet could be.
How building permits actually work in Burnaby
Burnaby runs its building permits through the city's Building Division, and most of the process now lives in one place: the My Permits Portal. Alteration and addition permits are applied for online, fees are paid by card, and status stays visible throughout. Like-for-like work such as swapping cabinets, fixtures, or flooring needs no permit at all; structural changes, additions, and most plumbing and electrical work do, with separate trade permits pulled by the licensed trades doing them.
Inspections are booked through the same portal or by phone, at least one business day ahead. We fold those bookings into the construction calendar so the framing, insulation, and drywall stages each land with an inspector already scheduled, instead of losing a day to a missed booking.
One change worth knowing: as of July 2026, Burnaby's updated development approval process means some projects need a development permit before a building permit can be submitted. The city is still publishing detail on which project types are captured, and most interior renovations will not be. We confirm which path applies during the estimate, so the approval route is settled before anyone commits to a start date.
What Burnaby's R1 zoning means for your renovation
In June 2024, Burnaby replaced its twelve single-family zoning districts with one R1 small-scale multi-unit housing district covering roughly thirty thousand lots. Most former single-family properties can now hold three or four dwellings depending on lot size, and up to six near frequent transit. A single-family home remains perfectly legal in R1 - nothing forces change - but the ceiling on what a lot can become has moved. Council also trimmed the rules in late 2025, reducing heights and lot coverage, so it is worth checking the current bylaw rather than last year's summaries.
Most homeowners use the new flexibility the modest way: legalizing a basement suite, or adding a laneway home for family or rental income while keeping the main house. Burnaby's laneway program has been in place since 2023 for lots with lane access, and its suite rules set clear requirements on size, ceiling height, entrance, and parking. Both are well-worn paths at city hall, and we design to the current requirements from day one.
Noise hours, street bins, and trees on a Burnaby site
Burnaby's noise bylaw sets construction hours at 7 am to 8 pm on weekdays and 9 am to 8 pm on Saturdays, with no contractor work on Sundays or statutory holidays. Working outside those hours takes advance city approval, granted case by case and never assumed. We plan crews and noisy stages like demolition around the six-day week from the start.
Disposal bins are their own small piece of planning. Burnaby's default position is that bins and site trailers should not sit on city property, so the right plan is usually a bin on the driveway, sized and scheduled around demolition days. Where street space is genuinely unavoidable, permission is arranged with the city before delivery, not after.
Trees are protected by a bylaw with real teeth. On an ordinary lot, conifers of thirty centimetres diameter and deciduous trees of forty-five need a permit to remove; on a lot under a development application, the threshold drops to twenty centimetres for every tree. Removals carry replacement-planting requirements and a security deposit, so if an addition sits anywhere near a protected tree, we bring it into the plan early.
How Burnaby compares with the cities next door
Burnaby's process reads as refreshingly conventional next to Vancouver's. Vancouver builds to its own building bylaw - the only city in BC that does - while Burnaby follows the BC Building Code, and Burnaby's portal carries a renovation from application to final inspection in one system. The paperwork and review streams genuinely differ across the boundary, which is why identical scopes get planned differently a few blocks apart.
Against its eastern neighbours the differences are texture, not substance. New Westminster layers heritage review over its oldest streets, which Burnaby has no equivalent for, and Coquitlam publishes a first-review target for residential applications. Saturday work runs later in Burnaby than in either. None of this changes the building code - but it changes the schedule, and we build each city's rhythm into the timeline we quote.
What we renovate in Burnaby
Kitchen Renovation
Burnaby's post-war bungalows put the kitchen in a small closed room at the back, and most owners want it opened to the living space — a beam job in nearly every case, and one we scope during the estimate. In the tower stock, kitchen renovations turn on strata rules: what the building allows for plumbing relocation usually decides the layout before design taste does.
Kitchen Renovation in Burnaby →Bathroom Renovation
The classic Burnaby bathroom project is the one-bathroom bungalow finally getting its second — usually carved into the basement, occasionally into a main-floor closet run. Original 1950s bathrooms here tend to hide galvanized supply lines and dated drain configurations that get replaced as part of the work.
Bathroom Renovation in Burnaby →Basement Renovation
Post-war Burnaby homes often have unfinished full-height basements that convert well to legal suites, and suite income is the stated goal in most of our basement conversations here. Separate laundry, sound insulation in the ceiling, and proper egress windows make the difference between a basement that rents well and one that merely exists.
Basement Renovation in Burnaby →Whole-Home Renovation
A whole-home renovation in Burnaby usually means a 1950s–60s house with good structure and a layout that no longer works — small rooms, closed kitchen, one bathroom. We rework the main floor, add bathrooms, replace the systems end to end, and often finish the basement in the same pass so the disruption happens once.
Whole-Home Renovation in Burnaby →Condo Renovation
Condo work in Burnaby concentrates in Metrotown and Brentwood, where concrete high-rises from the 80s onward each carry their own alteration bylaws and scheduling rules. The buildings run tight ships — elevator bookings, insured trades, defined work hours — and our job is making that process invisible to you.
Condo Renovation in Burnaby →Home Additions
Ground-level additions, second storeys, and conversions that make your home genuinely bigger - designed, engineered, permitted, and built as one project.
Home Additions in Burnaby →Secondary Suite Conversion
Basements converted into fully legal, rentable secondary suites - code compliance, permits, and inspections handled from day one.
Secondary Suite Conversion in Burnaby →Commercial Tenant Improvements
Office, retail, restaurant, and clinic build-outs delivered on fixed-price quotes and locked schedules - because downtime is the real cost.
Commercial Tenant Improvements in Burnaby →Permits & approvals in Burnaby
Building permits go through the City of Burnaby, and the process is conventional: application, plan review, inspections at the standard stages. Suite legalization and structural changes are the scopes that add review time, and condo work adds the building's own strata approval on top of anything the city requires. We prepare both tracks in parallel — the city package and the strata package — because waiting for one before starting the other is how condo projects lose a month for no reason.
- Post-war Burnaby basements usually have full ceiling height, which makes suite conversion more straightforward than in older Vancouver stock
- Homes from the 1950s and 60s often still run on undersized or fuse panels that get upgraded during any significant renovation
- Metrotown and Brentwood towers have strict strata rules on work hours, elevator use, and debris removal — logistics we book before demolition
- Pre-1990 homes need a hazmat survey before demolition; drywall mud and vinyl flooring from the era commonly test positive for asbestos
One Fixed Price
What we quote is what you pay. Our proposals are complete and itemized, so the number you sign is the number you settle on.
Communication First
Same-day answers, weekly updates, and one point of contact from the first call to the final walkthrough. You always know where your project stands.
Owner-Operated
The people you meet are the people who plan, manage, and stand behind the work. Full-scope general contracting — not a handyman service.
How we run projects in Burnaby
- 01
Initial Consultation
We meet to discuss your project, review your plans, and give you an honest assessment of scope, timeline, and budget.
- 02
Detailed Estimate
A complimentary site visit followed by complete, transparent pricing. No guesswork, no surprises.
- 03
Design Coordination
Already have plans? We review them. Need design support? We connect you with the right people and manage the process.
- 04
Pre-Construction
We handle permits, finalize schedules, and coordinate trades before a single tool hits the site.
- 05
Build & Execution
Our team performs the work directly. Weekly updates, same-day communication, and daily quality control throughout.
- 06
Handover
Final walkthrough, warranty information, and post-completion support. Built to last, documented clearly.
Where we work in Burnaby
We take on projects across Burnaby, including Metrotown, Brentwood, Burnaby Heights, Deer Lake, Capitol Hill, Edmonds, Lougheed.
Nearby areas we serve
Keep exploring
Ready to Start?
Get a fixed-price estimate for your renovation in Burnaby. We'll walk the space, price it completely, and stand behind the number.