Home Additions in Burnaby
An addition is the one renovation that makes your home genuinely bigger - new foundation, new framing, new roof, all tied into the house you already own in Burnaby. We manage additions from the first drawing to occupancy, with a fixed-price quote set before construction starts, not revised during it.
What a home addition involves
Additions come in a few shapes: a ground-level extension off the back or side, a bump-out that enlarges one room, a full second storey, or converting existing space like an attic or garage into living area. What separates an addition from an interior renovation is that most of the square footage is new construction - excavation, foundation, framing, envelope, and a full tie-in to your home's existing electrical, plumbing, and heating systems. That's also why design comes first: additions need engineer-stamped drawings before a permit can be issued, so the design and engineering phase isn't optional overhead - it's the front half of the project.
We manage that whole sequence as your general contractor and project manager. We coordinate the architect or designer and the structural engineer, handle the permit applications in the right order, and get the new structure weather-tight quickly so your existing home stays protected. You work with one point of contact, the owners are on site through the build, and the fixed-price scope is set once the drawings are done - covering the tie-in work and site realities, not just the framing.
Additions suit families who love their lot, their street, and their neighbourhood but have outgrown the house on it. The honest comparison is usually against moving - and once you count transaction costs and what you'd give up, building the space you're missing is often the stronger answer. We'll help you price that comparison plainly.
What's included
Design & engineering
Architect, designer, and structural engineer coordinated to produce the stamped drawings an addition always requires.
Excavation & foundation
Site prep, excavation, and new footings and foundation walls matched to your lot's conditions.
Framing & envelope
Structure, roofing, windows, and exterior finishing - made weather-tight quickly to protect the existing house.
Systems tie-in
Electrical, plumbing, and heating extended from your existing home into the new space, with panel and capacity checks up front.
Structural upgrades
Reinforcing the existing structure where a second storey or opened wall demands it.
Interior finishing
Drywall, flooring, trim, and paint that make the new space read as part of the original home, not an add-on.
Permits & inspections
Building and trade permits sequenced correctly, with inspections scheduled so the build never stalls waiting on an approval.
Zoning decides your addition before the building code does
Before a plans examiner ever opens your drawings, three zoning numbers have already decided what your addition can be: setbacks, height, and floor-space ratio. Setbacks fix how close new construction can sit to your property lines, height limits decide whether a second storey works at all, and floor-space ratio caps the total floor area your lot can carry. Every municipality writes its own numbers - the same addition can be simple on one Burnaby street and impossible two blocks away.
Additions can also involve two approvals that homeowners blur together. A building permit checks the construction against the BC Building Code; a development permit is about land use - siting, massing, design - and applies when a project pushes past what zoning allows outright, or sits in a designated heritage, environmental, or steep-slope area. Expect a survey early either way: municipalities commonly want a BC land surveyor's certificate proving where the house actually sits, because a fence line is not a property line.
The warranty question almost nobody asks about additions
At what point does an addition stop being a renovation and legally become a new home? BC's Homeowner Protection Act draws that line with the 75 percent rule: if the new construction ends up at least three times the size of the original structure remaining above the foundation - meaning three quarters or more of the finished home is new - the project counts as a substantially reconstructed home. It must then be built by a licensed residential builder carrying 2-5-10 home warranty insurance, exactly like a brand-new house.
A large addition paired with a gut renovation can cross that line without anyone noticing until permit time. And if the project creates a new self-contained unit - turning a house into a duplex, say - the new unit needs new-home registration regardless of percentages. As of mid-2026 these rules sit with BC Housing, and for borderline projects we confirm the answer before drawings are commissioned, not after.
Trees, slopes, and soil get a vote on your footprint
Most municipalities in the region protect trees on private property above a size threshold, and that protection follows the tree, not your plans. Removing a protected tree needs a permit, an arborist's report is often part of the application, and retained trees - including a neighbour's near the property line - get protection zones during construction. A healthy protected tree in the wrong spot can genuinely shift where an addition can go.
Slopes and soil can add a requirement of their own. Building officials in BC can require a geotechnical report from a qualified engineer wherever land may be subject to slipping, erosion, or flooding - and that explicitly includes additions to existing homes. If your lot in Burnaby backs onto a ravine, sits on fill, or slopes noticeably, expect a geotechnical assessment to shape how close to the slope you can build.
Where brand-new construction meets a decades-old house
The new space has to meet today's energy standards, not the ones your house was built to. Under the BC Energy Step Code, newly built floor area is generally expected to meet current insulation and window performance requirements even when the existing house predates them by decades - though how municipalities apply this to additions varies, and the rules are still evolving as of mid-2026. Specified early, it is a materials decision rather than a redesign.
Then there is the marriage of old and new. A fresh foundation settles differently than one that has carried a house for sixty years, floor levels rarely align as neatly as drawings suggest, and a second storey depends on what the original walls and footings can actually carry. That is why the tie-in deserves as much engineering attention as the new structure - and why we price it into the scope rather than hoping.
Permits & approvals in Burnaby
An addition always requires a building permit and engineer-stamped structural drawings, and depending on your lot's zoning and setbacks in Burnaby, development review may apply before the building permit can be issued. Plumbing and electrical permits cover the new services, with inspections staged through the build. Because additions move through a fuller review than interior renovations, we start the permit process early and in the correct sequence - it's the part of the timeline most homeowners underestimate.
Building permits go through the City of Burnaby, and the process is conventional: application, plan review, inspections at the standard stages. Suite legalization and structural changes are the scopes that add review time, and condo work adds the building's own strata approval on top of anything the city requires. We prepare both tracks in parallel — the city package and the strata package — because waiting for one before starting the other is how condo projects lose a month for no reason.
- Post-war Burnaby basements usually have full ceiling height, which makes suite conversion more straightforward than in older Vancouver stock
- Homes from the 1950s and 60s often still run on undersized or fuse panels that get upgraded during any significant renovation
- Metrotown and Brentwood towers have strict strata rules on work hours, elevator use, and debris removal — logistics we book before demolition
- Pre-1990 homes need a hazmat survey before demolition; drywall mud and vinyl flooring from the era commonly test positive for asbestos
How building permits actually work in Burnaby
Burnaby runs its building permits through the city's Building Division, and most of the process now lives in one place: the My Permits Portal. Alteration and addition permits are applied for online, fees are paid by card, and status stays visible throughout. Like-for-like work such as swapping cabinets, fixtures, or flooring needs no permit at all; structural changes, additions, and most plumbing and electrical work do, with separate trade permits pulled by the licensed trades doing them.
Inspections are booked through the same portal or by phone, at least one business day ahead. We fold those bookings into the construction calendar so the framing, insulation, and drywall stages each land with an inspector already scheduled, instead of losing a day to a missed booking.
One change worth knowing: as of July 2026, Burnaby's updated development approval process means some projects need a development permit before a building permit can be submitted. The city is still publishing detail on which project types are captured, and most interior renovations will not be. We confirm which path applies during the estimate, so the approval route is settled before anyone commits to a start date.
One Fixed Price
What we quote is what you pay. Our proposals are complete and itemized, so the number you sign is the number you settle on.
Communication First
Same-day answers, weekly updates, and one point of contact from the first call to the final walkthrough. You always know where your project stands.
Owner-Operated
The people you meet are the people who plan, manage, and stand behind the work. Full-scope general contracting — not a handyman service.
How your home addition runs, start to finish
- 01
Initial Consultation
We meet to discuss your project, review your plans, and give you an honest assessment of scope, timeline, and budget.
- 02
Detailed Estimate
A complimentary site visit followed by complete, transparent pricing. No guesswork, no surprises.
- 03
Design Coordination
Already have plans? We review them. Need design support? We connect you with the right people and manage the process.
- 04
Pre-Construction
We handle permits, finalize schedules, and coordinate trades before a single tool hits the site.
- 05
Build & Execution
Our team performs the work directly. Weekly updates, same-day communication, and daily quality control throughout.
- 06
Handover
Final walkthrough, warranty information, and post-completion support. Built to last, documented clearly.
Home Additions in Burnaby: FAQs
How much does a home addition cost in Burnaby?
Ground-level additions in Burnaby typically run $170 – $280 per square foot, with second-storey and design-build additions at $280 per square foot and up. Converting existing space like an attic or garage costs less - roughly $90 – $170 per square foot - because the structure already exists. Your real number comes from a fixed-price quote built on your drawings, which is exactly the process we run.
How long does a home addition take?
Plan on 3 to 6 months of construction, plus several months before that for design, engineering, and permit review - additions move through a fuller review process than interior renovations. Starting the planning 6 to 12 months ahead of your ideal break-ground date is realistic, not cautious.
Do I need an architect for an addition?
You need stamped drawings - additions change your home's structure, so a licensed structural engineer is always involved, and larger projects need a registered architect or building designer as well. We coordinate that team for you, and we'd rather you spend on design once than on mid-build corrections repeatedly.
Can we live at home while the addition is built?
Usually, yes - and more comfortably than during an interior renovation. Most of the work happens outside your existing walls until the tie-in stage, so daily life carries on. We plan the few genuinely disruptive windows - the wall opening, the systems connections - in advance and tell you exactly when they're coming.
Wouldn't it be cheaper to just move to a bigger house?
Sometimes - and it's worth running both numbers honestly before deciding, which we're glad to help with. Selling and buying carries property transfer tax, realtor fees, and moving costs, and you give up the lot, street, and school catchment you chose in the first place. An addition costs real money too; the point is to compare two complete numbers, not a guess against a hope.